responsible for electrical maintenance of plant
• installation of new ABB (LT+HT cables)
• Dismantling of old copper/silver cables with new insulated ABC cable
• new connection
• installation of HT/LT poles
• Worked as a active member in upgradation of PLC of plant.
• Worked in all substations of plant including limestone crusher, clay crusher, raw mill, pre heater, kiln, cooler, gypsum crusher, cement mill, packing plant.
• Pre planning and scheduling the daily, weekly, monthly jobs and shut down jobs Activities.
• Book keeping record for all Equipment history especially Major equipment, which include all maintenance carried out detail, maintenance comment.
• Maintenance, troubleshooting and inspection of Electrostatic Precipitator (ESP) and
Bag Filters installed at plant for dust control.
• Worked on relay controls, PLC control, DC drive panel, Battery Charger.
• Worked on measuring instrument pressure, level transducer, Proximity sensors, speed and temperature sensors also work on pneumatic system pneumatic control and drives including calibration of different instruments.
• Worked on weigh feeders, calibration of weigh feeders and correction of error in feeder .
• Worked on different load cells maintenance and troubleshooting.
• Worked on ABB Gas Analyzers, calibration of analyzers including span and zero gas calibration, maintenance of analyzers & troubleshooting .
• Design, construction and installation of Electrical panel for fire safety system.
• Installation of new MCC, PDB at cement mill.